building energy standard, offers four distinct compliance paths plus the option of 3) Prescriptive/trade-off with detailed trade-off path for the envelope. Prescriptive. Option. Energy Cost. Budget. Trade Off. Option. Envelope Compliance Fenestration. • Building Envelope Trade-Off Options (Section 5.4)   Figure 7-8 Envelope Trade-Off Option Test Building (Source: ASHRAE 90.1-2007 User's Manual). Prototype Buildings used for Performance Methods (FEC  5.6, Building Envelope Trade-Off Option. 5.2.2 Projects using the Energy Cost Budget. Method. (Section 11 of this standard) cost). 5.4  1 Jul 2019 three options. The middle option (Building Envelope Trade-Off Option) reads: 5.6. 1 The building envelope complies with the standard if:.

5.6, Building Envelope Trade-Off Option. 5.2.2 Projects using the Energy Cost Budget. Method. (Section 11 of this standard) cost). 5.4 

2.3.3 Building Envelope Trade-Off Option . minimum energy efficiency requirements for building envelope, lighting, HVAC, electrical system, water heating and  Opaque building envelope assembly trade-off. ➢ The plans are to identify the building envelope assemblies requiring the trade-off option and building envelope  envelope trade-off path and building energy performance compliance paths. buildings. It includes three options for compliance; Prescriptive, Trade-. Off, and  Policy Recommendation for the Building Envelope . The “Tradeoff/REScheck” pathway allows builders to conduct simple user selects the Georgia option. 14 Sep 2016 under the prescriptive path option called the “Building Envelope Trade-Off Option” that allows the designer to randomly vary the performance  Section 5.6, “Building Envelope Trade-Off Options.” Note: While Section 5.5 allows insulated mass walls with prescribed R-values, the tables also require. 25 Aug 2017 Airtightness – two compliance options - 2; Simple trade-off; Simple trade-off – overall limitations; Questions? Energy Efficiency in Housing and 

ing a statewide building code across Pennsylvania. Above-Grade Thermal Envelope Trade-Off tion trade-off and as a second check of the other options.

Section 5: Building Envelope, Prescriptive Option . Opaque Roofs (§5.5.3.1) Attic and all other roofs: “all other roofs” Comments: 5.8.1.8 prohibits installing roof insulation on suspended ceiling with removable ceiling tiles 5.8.1.6 prohibits recessing light fixtures into insulation unless area is < 1% 5.8.1.4 requires baffles around eave The Building Envelope Trade‐Off method provides much greater flexibility to the designer over the Prescriptive Method. Only the building envelope components may be considered, such as the walls, roofs, windows, doors, skylights, and foundation insulation. The Envelope Trade-off Method permits the use of COMcheck to provide a more economical solution. A 10,000 ft warehouse that is 200’ long x 50’ wide with a 16’ eave height provides a good example. For simplicity we will ignore doors and windows. Upgrading the thermal efficiency of the doors and windows can save money on a project.

The Building Envelope Trade‐Off method provides much greater flexibility to the designer over the Prescriptive Method. Only the building envelope components may be considered, such as the walls, roofs, windows, doors, skylights, and foundation insulation.

14 Jul 2011 a) Building envelopes, except for unconditioned storage spaces or Exception to 84.2(a): The envelope trade-off option of $5.4 may be used in. design of the building envelope on an optimization of the different performance Options. Solution. Outer wall. Insulation: 125 to 400 mm (4.9-15.7 in.) 125 mm ( 4.9 in.) Deck optimisation of design trade-offs for solar low energy buildings. 10 May 2011 BUILDING ENERGY CODES energycodes.gov. • 2x6 construction now “required” in some zones. – Envelope trade-off options limited.

BUILDING ENVELOPE. TRADE-OFF OPTION. ENERGY COST. BUDGET METHOD. Energy Performance Standards for MURBs. ASHRAE 90.1 and the 2011 

Prescriptive. Option. Energy Cost. Budget. Trade Off. Option. Envelope Compliance Fenestration. • Building Envelope Trade-Off Options (Section 5.4)   Figure 7-8 Envelope Trade-Off Option Test Building (Source: ASHRAE 90.1-2007 User's Manual). Prototype Buildings used for Performance Methods (FEC  5.6, Building Envelope Trade-Off Option. 5.2.2 Projects using the Energy Cost Budget. Method. (Section 11 of this standard) cost). 5.4